Internal Audits · Compliance plan

The programme, the plan, the finding and its closure

Internal audit software for ISO 13485 §8.2.4. An annual audit programme with scheduled plans, checklists executed against them, findings classified and tracked to closure. An external auditor gets scoped, time-limited access rather than a copy of your quality system.

  • ISO 13485 §8.2.4
Module 5 of 5Included in the Compliance plan
ISO 13485 §8.2.4

Internal Audits

The audit programme, its plans, checklists and findings, through to closure evidence. External auditors can be given scoped, time-limited access rather than a copy of your quality system.

What it does
  • Audit programmeAnnual schedule with planned audits
  • ChecklistsExecuted against the plan
  • FindingsClassified, assigned and tracked to closure
  • Findings raise CAPAsWith linkage preserved
  • External auditor accessScoped and time-limited
Records it produces
  • The audit programme and its execution
  • Findings, owners and closure evidence
  • CAPAs raised from findings
Where it sits

What it triggers, and what triggers it

Audits read everything the other modules produce and raise CAPAs from what they find.

CAPA

A finding raises a CAPA with the linkage kept, so closure evidence is where the auditor looks for it.

Training Management

The training matrix and outstanding-training report are audited as records, not reconstructed.

Auditor role

Read-only, scoped to what you share, and time-limited. Their access is itself on the audit trail.

The other modules

Everything else in the Compliance plan

Document Control

ISO 13485 §4.2

Enforced revision history, approval workflows and effective dates. Only the current approved version circulates; every superseded one stays retrievable.

Training Management

ISO 13485 §6.2

Role-based matrices, assignment straight from a controlled document, quizzes, and requalification tracked per person.

Logged, risk-assessed, investigated and dispositioned, with a controlled path into CAPA when the investigation warrants one.

CAPA

ISO 13485 §8.5

Owned action items, due dates, and an effectiveness review that must complete before closure.

We use analytics cookies (page views, clicks, scroll and mouse movement) to understand how visitors use this site. Nothing is tracked until you accept. See our Cookie Notice for what each cookie is for.